Fire and Safety Compliance

Factories Act, 1948 , National Building Code (NBC) of India, 2016 – Part 4 (Fire and Life Safety), Model Fire Services Act, 1957
  • Fire and Safety Compliance is essential for any industrial or commercial establishment involved in manufacturing, processing, storage, or handling of hazardous materials. The law requires facilities to install and maintain appropriate fire protection systems, obtain a Fire NOC, and comply with PESO and state fire safety regulations.

  • Petroleum and chemical storage units

  • Explosives and gas cylinder facilities

  • Manufacturing plants

  • Warehouses and logistics parks

  • Fuel retail outlets

  • Industrial processing units

  • ISO tank and pressure vessel yards

Facilities That Require Fire & Safety Compliance

Forms & Application Process

  • Application for Fire NOC – For industrial units, plants, and warehouses
    Issued by: Local Fire Department / Chief Fire Officer

  • Fire System Drawings and Layouts – To be submitted for approval as per NBC guidelines

  • Affidavit of Compliance – Declaring installation of approved fire systems

  • Renewal Application – For annual revalidation of NOC

Processing Time: 15–25 working days
Renewal: Annual or biennial, depending on state regulations and risk category

Alpha Engineers Can assist with

  • Site survey and gap assessment

  • Fire system design as per NBC and PESO guidelines

  • Preparation and submission of Fire NOC application

  • Liaison with Fire Department for inspections and approvals

  • Coordination with PESO for fire safety norms in hazardous installations

  • Assist with renewals, updates, or changes to NOC scope

Frequently asked questions - Fire and Safety Compliance

What is a Fire NOC and who needs it?


A Fire NOC (No Objection Certificate) is a mandatory document certifying that a building or industrial unit complies with fire safety norms. It is required for all factories, warehouses, fuel/gas facilities, and hazardous material units.

What is the validity of a Fire NOC?


Usually 1 to 2 years, depending on your industry, facility type, and local fire authority regulations.

Which documents are needed to apply for a Fire NOC?
  • Site and building layout plan

  • Fire system design and specifications

  • Ownership/lease documents

  • Declaration of operations conducted

  • Photographs of existing fire safety systems

  • Past fire NOC copy (for renewal)

How long does it take to get a Fire NOC?


The process typically takes 15 to 25 working days, including site inspection and compliance verification.

Can Alpha Engineers help with designing fire systems?


Yes. We provide design consultancy, compliance audits, and full support for getting Fire NOC and PESO-related fire approvals..